{"id":5574,"date":"2020-06-22T11:24:04","date_gmt":"2020-06-22T11:24:04","guid":{"rendered":"https:\/\/www.eshcon.co.uk\/?page_id=5574"},"modified":"2023-10-15T15:40:43","modified_gmt":"2023-10-15T15:40:43","slug":"energy-esos","status":"publish","type":"page","link":"https:\/\/www.eshcon.co.uk\/?page_id=5574","title":{"rendered":"Energy &#038; ESOS"},"content":{"rendered":"<h1>Energy &amp; ESOS<\/h1>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4048\" src=\"https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2017\/08\/Energy-elec-meter-300x204.jpg\" alt=\"Eshcon Anya Ledwith ESOS Lead ESOS Assessor Compliance Energy\" width=\"474\" height=\"322\" srcset=\"https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2017\/08\/Energy-elec-meter-300x204.jpg 300w, https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2017\/08\/Energy-elec-meter-768x523.jpg 768w, https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2017\/08\/Energy-elec-meter-1024x697.jpg 1024w, https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2017\/08\/Energy-elec-meter.jpg 1077w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3>ESOS \u2013 Energy Savings Opportunity Scheme<\/h3>\n<p>The ESOS regulations require large enterprises to do comprehensive energy audits every four years, carried out by an approved Lead Assessor.<\/p>\n<p>Eshcon&#8217;s 3-stage ESOS Assessment helps you ensure compliance:<\/p>\n<ul>\n<li>Measure energy consumption (energy in buildings &amp; business travel)<\/li>\n<li>Energy Audits &#8211; cost-effective energy efficiency recommendations; these include no cost &amp; low cost opportunities, with a specific consideration of behavioural &amp; operational changes, not just the relevant technologies<\/li>\n<li>Report to Board-level Director and provide information for reporting compliance to the Environment Agency.<\/li>\n<\/ul>\n<p>As a registered Lead ESOS Assessor, I guide you through the whole compliance process so it is <strong>useful &amp; trouble-free<\/strong> for you. I examine not only relevant technologies in delivering energy reductions, but to also consider behavioural &amp; operational changes, as well as management processes. This is because people are put off by activities that are costly, have a long timescale or are difficult to implement. This sets me apart from many ESOS Assessors, who understand only &amp; thus focus on technological opportunities.<\/p>\n<p>ESOS Phase 3 deadline has been extended to 5th June 2024.<\/p>\n<p><span style=\"text-decoration: underline;\">Find out more:<\/span><\/p>\n<p>[download_after_email id=&#8221;6428&#8243;]<\/p>\n<p>&nbsp;<\/p>\n<h3>ISO 50001 Energy Management System<\/h3>\n<p>Another route to ESOS compliance is by putting in an ISO 50001 Energy Management System.<\/p>\n<p>Following a similar structure as ISO 14001, the EnMS focuses on energy in buildings &amp;, if relevant, transport.<\/p>\n<p><span style=\"text-decoration: underline;\">Find out more:<\/span><\/p>\n<p>[download_after_email id=&#8221;6445&#8243;]<\/p>\n<p>&nbsp;<\/p>\n<h3>Energy Efficiency Audits<\/h3>\n<p>Energy audits to review the energy use in your building(s) &amp; identify improvements to save energy, carbon &amp; money.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.eshcon.co.uk\/getintouch\/\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-5707 size-full\" src=\"https:\/\/www.eshcon.co.uk\/wp-content\/uploads\/2020\/06\/Get-in-Touch-with-Eshcon-button.png\" alt=\"Get in Touch with Eshcon button\" width=\"261\" height=\"91\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.eshcon.co.uk\/services\/\">Back to Services<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Energy &amp; ESOS &nbsp; ESOS \u2013 Energy Savings Opportunity Scheme The ESOS regulations require large enterprises to do comprehensive energy audits every four years, carried out by an approved Lead Assessor. Eshcon&#8217;s 3-stage ESOS Assessment helps you ensure compliance: Measure energy consumption (energy in buildings &amp; business travel) Energy Audits &#8211; cost-effective energy efficiency recommendations; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":410,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5574","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/5574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5574"}],"version-history":[{"count":18,"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/5574\/revisions"}],"predecessor-version":[{"id":6683,"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/5574\/revisions\/6683"}],"up":[{"embeddable":true,"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/410"}],"wp:attachment":[{"href":"https:\/\/www.eshcon.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}